Posted by on Mar 21, 2012 in Projects | 0 comments

Roadway Reconstruction & Related Work on a Section of Washington Street, Walpole, MA

The work under this contract will consist of installation new HMA and cement concrete sidewalk within the existing right of way of Washington Street from the intersection of South Street and Washington Street to the intersection of Summer Street and Washington Street. Read more below under Description.

 

 

Resurfacing & Related Work on a Section of I-495, Bridgewater, Raynham, Taunton

The work under this contract consists of furnishing all necessary labor, materials, and equipment required to perform the work described below, as well as all other related work incidental to a project of this nature. Read More below under Description.

 

 

Resurfacing & Related Work on a Section of I-95, Walpole, MA

The work shall consist of full width asphalt pavement micro-milling and overlaying with hot mixed asphalt (HMA); super-pave intermediate and asphalt rubber gap graded friction course. All mainline HMA courses (base, intermediate, friction) on this project shall be warm mix technology.Read more below, under Description.

 

 

Roadway Work on Route 20 (Main St.) and Rte. 10/202

The project involves reconstruction of approx. 2500 M (1.6 Miles) of state highways as well as Park Square in the center of downtown Westfield. The work includes tree removal, full depth roadway reconstruction, building and bridge demolition, water lines, storm drainage, granite seat walls, lighting, traffic signals, granite paving, landscaping and site furnishings.