Bridgewater High School | Site/Excavation

New infrastructure for 40 acres site. Four new drainage ponds and 8 miles of new utilities. Foundation excavation and concrete slab preparation for 200,000 SY building. Furnished and installed over 10,000 tons of bituminous concrete for roadways and parking lots.

Back to Site/Excavation Projects  Back to ALL Projects Page

Bacon Construction
$5,500,000
New infrastructure for 40 acres site. Four new drainage ponds and 8 miles of new utilities. Foundation excavation and concrete slab preparation for 200,000 SY building. Furnished and installed over 10,000 tons of bituminous concrete for roadways and parking lots.