Utility

Posted by on Mar 23, 2012 in Projects | 0 comments

Utility

Tockwotton Home – East Providence, RI Phasellus risus felis, venenatis non egestas a, aliquam at ante. Pellentesque quis metus pharetra lorem varius egestas. Phasellus risus felis, venenatis non egestas a, aliquam at ante. Pellentesque quis metus pharetra lorem varius egestas. Ut placerat rhoncus metus in tristique. Aliquam erat volutpat. Lorem ipsum dolor sit amet, consectetur adipiscing elit. Quisque ut augue libero.   Boylston Street | Newton, MA Phasellus risus felis, venenatis non egestas a, aliquam at ante. Pellentesque quis metus pharetra lorem varius egestas. Phasellus risus felis, venenatis non egestas a, aliquam at ante. Pellentesque quis metus pharetra lorem varius egestas. Ut placerat rhoncus metus in tristique. Aliquam erat volutpat. Lorem ipsum dolor sit amet, consectetur adipiscing elit. Quisque ut augue libero.   Foxboro Stadium | Massachusetts Construction of 3 bridges & R/W Inc. Exc., Drainage, Placement of Surface Course, Lightning, Traffic Markings & Landscaping. 38,400 CY Earth Excavation | 22,800 CY of Rock Excitation | 21,000 tons of asphalt installed.       Fiber Optic Infrastructure, RI & MA Duct Install and Proofing. Trenching and Bridge Attachment with Manholes. Dug trenches & installed 196,000 LF of fiber optic conduit in various areas in RI & MA.    ...

Read More

Bridge

Posted by on Mar 23, 2012 in Projects | 0 comments

Bridge

Bridge Replacement Warner Lane over Clear River The project entails demolition of the existing superstructure and partial demolition of the substructure as shown on the plans. The work also includes the reconstruction of approximately 267 feet of roadway including the installation of safety appurtenances.    ...

Read More

Airport

Posted by on Mar 23, 2012 in Projects | 0 comments

Airport

North Central Airport | Airport This project generally consists of the reconstruction of Taxiway B including; reclaiming existing bituminous surface course with existing base course material, paving, pavement markings as well as lighting and signage improvements for approximately 5,000 feet x 50 feet of pavement.  ...

Read More

Railway

Posted by on Mar 23, 2012 in Projects | 0 comments

Railway

Pine River Bridge Amtrak Superstructure replacement of under grade bridge 84.41 over the Pine River at Stoney Creek, Connecticut.    

Read More

Marine/Dam

Posted by on Mar 23, 2012 in Projects | 0 comments

Marine/Dam

Waterfall Hills | Canton MA Installation of erosion and sediment control devices. Installation of temporary cofferdams and bypass piping. Removal and disposal of the existing spillway structure. Excavation of existing stone fill and rip rap in the project area, stockpiling for reuse. Placing downstream rip rap scour protection. Removing the temporary cofferdam, bypass pipes and associated back-filling. Clean site, restore impoundment elevation and disturbed areas, and demobilize.     Limerock Dam | Marine/Dam Installation of erosion and sediment control devices. Construct access road and staging area. Drawdown impoundment and construct temporary cofferdam and diversion structures. Clear and grub all brush, trees and vegetation, including stumps as indicated. Demolish, remove and dispose existing site features indicated for removal. Excavate to the lines and grades indicated. More on description...

Read More

Site/Excavation

Posted by on Mar 23, 2012 in Projects | 0 comments

Site/Excavation

Walmart Westfield The project involves reconstruction of approx. 2500 M (1.6 Miles) of state highways as well as Park Square in the center of downtown Westfield. The work includes tree removal, full depth roadway reconstruction, building and bridge demolition, water lines, storm drainage, granite seatwalls, lighting, traffic signals, granite paving, landscaping and site furnishings.   Stop & Shop Phasellus risus felis, venenatis non egestas a, aliquam at ante. Pellentesque quis metus pharetra lorem varius egestas. Phasellus risus felis, venenatis non egestas a, aliquam at ante. Pellentesque quis metus pharetra lorem varius egestas. Ut placerat rhoncus metus in tristique. Aliquam erat volutpat. Lorem ipsum dolor sit amet, consectetur adipiscing elit. Quisque ut augue libero.   UMASS Millbury Phasellus risus felis, venenatis non egestas a, aliquam at ante. Pellentesque quis metus pharetra lorem varius egestas. Phasellus risus felis, venenatis non egestas a, aliquam at ante. Pellentesque quis metus pharetra lorem varius egestas. Ut placerat rhoncus metus in tristique. Aliquam erat volutpat. Lorem ipsum dolor sit amet, consectetur adipiscing elit. Quisque ut augue libero.   Cedar Brook Earthwork, Utilities, Concrete & Landscaping.         Lincoln Park Parking Facility for 4,000 cars. New storm drainage system, water systems, fire protection underground distribution system. New Entrance and access boulevard, 60,000 linear feet of concrete curb, underground telephone, communication and electric distribution system.     Bridgewater High School New infrastructure for 40 acres site. Four new drainage ponds and 8 miles of new utilities. Foundation excavation and concrete slab preparation for 200,000 SY building. Furnished and installed over 10,000 tons of bituminous concrete for roadways and parking lots.     NBA Hall Of Fame | Site/Excavation Heavy construction including extensive excavation, preparation for underground parking garage slab, installation of per-packaged drainage pump station, construction and paving of access roadways.  ...

Read More