Waterfall Hills | Canton MA

Posted by on Mar 27, 2012 in Marine/Dam, Waterafll | Marine/Dam | 0 comments

Waterfall Hills | Canton MA

Installation of erosion and sediment control devices. Installation of temporary cofferdams and bypass piping. Removal and disposal of the existing spillway structure. Excavation of existing stone fill and rip rap in the project area, stockpiling for reuse. Placing downstream rip rap scour protection. Removing the temporary cofferdam, bypass pipes and associated back-filling. Clean site, restore impoundment elevation and disturbed areas, and demobilize.

Read More