Lynch’s 40+ year partnership with the Rhode Island and Massachusetts Department’s of Transportation is a testament to successful relationships built on integrity, trust, and getting the job done right and on time!

Click on the links to below to see a selection of our recent public work projects.

Rhode Island DOT

2022
  • 2022 Paver Placed Elastomeric Surface Treatment
  • Route 146 Reconstruction (Design/Build)
  • Boston Neck Road & South County Trail Improvements
  • I-95 Resurfacing
2021
  • Pell Bridge Ramps – Phase II
2020
  • Pell Bridge Ramps – Phase I
  • I-95 Resurfacing Contract – 2B
2019
  • Bridge Group 3 Pawtucket
  • Immediate Needs Steel Repairs C-3
  • Emergency Repairs to Hillsgrove RR Bridge
  • High Friction Surface Treatment I-95
  • Bridge Group 1 Providence
  • Statewide Bridge Repairs C4 – Amtrak Bridges
  • 2019 Paver Placed Elastomeric Surface Treatment
  • Improvements to US Route 6
  • Lafayette Road Bridge
2018
  • 2018 Statewide Intersection Safety Improvements
  • Intersection Safety Improvements to Route 44
  • Marshall Avenue Drainage Improvements
  • 1R Improvements to Winsor Avenue
  • Safety Improvements Statewide
  • Pine Street Bridge No. 548
  • Repairs to Main Street Bridge
  • Repairs to East Bay Bike Path
2017
  • 2017 Rubberized Asphalt Chip Seal
  • Route 24 Improvements
  • Route 146 Improvements
  • Improvements to East Main Road & Park Ave
  • Canonchet Bridge No. 56701
  • High Friction Surface Treatment
  • Mussey Brook Bridge No. 380
  • Emergency Bridge Repairs No. 404, 1116, 1177
2016
2015
  • Blackstone River Bikeway Segment 1A
  • 2015 Statewide Resurfacing C-1
  • Improvements to New River Rd & Victory Hwy
  • Repairs to Railroad Street
  • Improvements to Route 4 C-1
  • 1R Improvements to Route 102 C-3
  • Providence Station Enhancements
  • Route 146A Contract 2
2014
  • 2014 HSIP Improvements C-1
2013
  • Repairs to Wakefield Bridge No. 20
  • 2013 Paver Placed Elastomeric Surface Treatment
  • Type I Emergency Repairs to Ocean Ave Seawall
  • Repairs to Beach Street, Route 1, Succotash Road
2012
  • Pascoag Bridge No. 198
  • Type I Emergency Repair to Route 12 Culvert
  • Emergency Repairs on Ocean Road Seawall
2011
  • Emergency Repairs to Louisquissett Pike Bridge
  • 1R Improvements to Dunn’s Corner Road
  • Route 116 Pleasantville Avenue
  • Blackstone River Bikeway Segment 1B/2
  • I-95 Resurfacing Southern C-3
  • Improvements to Old Post Road Route 1A
  • Asylum Road Colt State Park
  • Resurfacing Route 146
2010
  • Appanaug Mill Bridge No. 138
  • 1R High Street / Diamond Hill Road
  • STC Signal Installations – South & Central
  • South County Bike Path C-3
  • 1R Improvements to 102 C-1
  • Improvements to Colebrook Road, Little Compton
  • Reclamation of Moosup Valley Road
  • Emergency Repairs to Kent County Maint. District
  • Emergency Repairs to Bristol & Newport County
  • Emergency Repairs to Bike Paths & Trails
  • Coventry Greenway Bike Path
  • East Bay Bike Path Bridge Repairs
2009
  • Safety Improvements to Route 101
  • Stormwater Retrofit Demo – Site W-6
  • 2009 Statewide Resurfacing C-3
  • Statewide Drainage Improvements 2009 C-3
  • 1R Nate Whipple Highway C-2
  • Route 146 /I-295 Frontage Roads
  • Paver Placed Elastomeric Surface Treatment
  • Signal Optimization 2009

Massachusetts DOT – Highway

2022
  • Resurfacing Route 2 Fitchburg
  • Roadway Reconstruction Route 113 Dunstable
  • Resurfacing Route 122A Holden
  • District 3 Pedestrian & Bicycle Improvements
  • Reconstruction McCracken Road Millbury
  • District 3 Sidewalk & ADA Improvements
  • I-495 Exit 25B Ramp Hudson
2021
  • ADA Improvements District 4 Medford Somerville
  • Resurfacing  Pearson Boulevard Gardener
  • Reconstruction Route 138 Raynham
  • Intersection Improvements Allen Street New Bedford
  • Resurfacing Route 44 Seekonk
  • Resurfacing I-90 Hopkinton-Westborough
  • Sidewalk Improvements District 3
  • Resurfacing I-495 Mansfield-Franklin
2020
  • Reconstruction Auburn Street
  • Resurfacing Route 44 Dighton Taunton
  • Pedestrian & Bicycle Improvements District 3
  • Resurfacing I-190 Holden-West Boylston
  • Resurfacing District 3
  • Twin Cities Rail Trail Fitchburg-Leominster
2019
  • Emergency Pavement Repairs District 3
  • Intersection Improvements Kelley Square Worcester
  • Intersection Improvements Route 20 Sudbury
  • Intersection Improvements Route 122A Worcester
  • Resurfacing I-495 Middleborough
  • Emergency Pavement Repairs District 3
  • Clark Road Water Main, Sturbridge
2018
  • Drainage Improvements, Sturbridge
  • Reconstruction of Route 140, Princeton
  • Resurfacing Route 146, Millville – Uxbridge
  • Resurfacing Route 190, Sterling
  • Resurfacing Route 9, Southborough
  • Resurfacing Route 88, Westport C-3
2016
2015
2014
2013
  • ADA Improvements, District 4
  • Emergency Pavement Repairs, District 3
  • Reconstruction I-90
2012
  • Emergency Pavement Repairs, District 3
  • Resurfacing Route 49, Sturbridge
2011
  • Reconstruction of Belmont Street, Worcester
  • Resurfacing of I-495, Bridgewater
  • Reconstruction of Washington Street, Walpole
  • Resurfacing Route I-395, Oxford
  • Resurfacing Route 20, Northborough
  • Resurfacing, District 3
  • Resurfacing Route I-95, Waltham

J.H. Lynch & Sons, Inc.
50 Lynch Place
Cumberland, RI 02864

(401) 333-4300
(800) 545-9624
FAX: (401) 333-2659
[email protected]