Route 146 Bridge

Millbury, MA

CLIENT

Massachsetts Department of Transportation - Highway Division

DURATION

56 Months

COST

$20,444,070

SERVICES

Lynch performed complete replacement of the Route 146 bridge over Elm Street using conventional methods for both the substructure and superstructure, as well as complete reconstruction of the interchnge at Elm Street including excavation, utilities, traffic signals and bituminous concrete paving work.

Lynch performed complete replacement of the Route 146 bridge over Elm Street using conventional methods for both the substructure and superstructure, as well as complete reconstruction of the interchange at Elm Street including excavation, utilities, traffic signals and bituminous concrete paving work.

J.H. Lynch & Sons, Inc.
50 Lynch Place
Cumberland, RI 02864

(401) 333-4300
(800) 545-9624
FAX: (401) 333-2659
[email protected]